Utilities Kingston home page Link: Home Page Link: Site map
Link: Water and sewer Link: Natural gas Link: Electricity Link: Networks
Slogan: All your utility services under one roof
Link: About us
Link: Your account
Link: Careers
Link: News
Link: Tenders
Link: Emergency service
Link: Contact us
 
Heading: Linked

WATER WATCHERS

The Canadian Water Resources Association is a national organization for individuals and organizations interested in the management of Canada's water resources.

[VISIT]

Link: More links



Electricity Retrofit Incentive Program

ABOUT THE PROGRAM

The Ontario Power Authority (OPA) in cooperation with Kingston Hydro, are assisting Commercial, Industrial, and Institutional and Agricultural customers to conserve energy.

The Electricity Retrofit Incentive Program appreciates that when a business is making choices between different equipment options the desired choice is for the most efficient solution, but for financing reason or timing reasons other choices may be made. We would like to influence the decision in favour of the most electricity efficient ones.

The Electricity Retrofit Incentive Program focuses on the areas of lighting, motors, heating ventilation and air conditioning (HVAC) and the overall electricity systems.

TIMELINES

This is a limited time offer and applications are accepted on a first come, first served basis.

  • Project application deadline December 31, 2010.
  • Eligible projects must be completed prior to December 1, 2011.

WHO QUALIFIES?

Applicants must be Kingston Hydro commercial customers.

Applicants may be owners or tenants of business premises supplied by Kingston Hydro. Please note that if you are a tenant, you must obtain permission from the property owner for installation of the measures for which an incentive is claimed.

QUALIFYING PROJECTS

Incentives will be available for pre-approved projects that result in measurable reductions in electrical peak demand.

These projects may be completed using energy efficient technologies prescribed by the program or may be based on innovative custom initiatives.

PRESCRIPTIVE TECHNOLOGIES

Incentives are offered for pre-approved technologies on a per unit basis. For additional information about qualifying Prescriptive Technologies view the project guidelines from the downloads above.

An incentive is available for pre-approved technologies as detailed on the Prescriptive worksheets.

Lighting

  • Fluorescent lighting systems (T8, T5, CFL)
  • Metal halide lighting systems
  • LED "EXIT" signs
  • Occupancy sensors

Motors

  • Three phase premium efficiency motors 1-200 hp

Cooling equipment

  • Unitary A/C units up to 25 tons that are energy star qualified or CEE compliant

This list may change over time, so please check www.everykilowattcounts.com/ERIP for updates.

CUSTOM PROJECTS

  • All technology, equipment and systems are evaluated on the basis of their electrical demand reduction. The incentive offered of $150/kW is based specifically on the level of improvement. For additional information about qualifying Custom Projects view the project guidelines from the downloads above.

HOW DO I PARTICIPATE?

There are two ways to get started:

  1. Use the self-serve method by reviewing the documentation and printing or downloading the application and appropriate documents.
  2. Contact the Kingston Hydro office at 613-546-0000



Image: Electricity Retrofit Program Logo

IN THIS SECTION


QUESTIONS & ANSWERS

Answers to frequently asked questions.

 

RELATED LINK


EVERY KILOWATT COUNTS

Visit the Every Kilowatt Counts web site for additional information and updates.

 

DOWNLOADS


PROJECT APPLICATION

Download the Prescriptive and Custom Project Application form [DOC].

PERSCRIPTIVE PROJECT

Download the Perscriptive Project Guideline [PDF].

CUSTOM PROJECT

Download the Custom Project Guideline [PDF].

LIGHTING WORKSHEET

Download the Lighting System Worksheet [XLS].

MOTOR WORKSHEET

Download the Motor Worksheet [XLS].

UNITARY AC WORKSHEET

Download the Unitary AC Worksheet [XLS].

TRANSFORMER SHEET

Download the Transformer Worksheet [XLS].

CUSTOM WORKSHEET

Download the Custom Project Worksheet [XLS].

CUSTOM CALCULATION

Download the Custom Project Calculation Sheet [XLS].