|
|


|

Cataraqui River Crossing:
Background Reports

|
 |
|
IN THIS SECTION
CATARAQUI RIVER INTRO
Read about the water main and sewage forcemain that were installed under the Great Cataraqui River.
|
|
|
 |
[DOWNLOAD]
|
Document Description
|
File Size
|
|
Moisture test results and specific gravity analysis of sediments, organics and clay found beneath the Cataraqui River.
|
[1.84 MB]
|
|
Schedule B File Report: Great Cataraqui River Utilities Crossing Project
|
[80 KB]
|
|
Schedule B: EA Addendum
|
[3.27 MB]
|
|
Table 1: Matrix of Potential Impacts and Mitigating Measures
|
[65 KB]
|
|
Federal Environmental Screening Report
|
[1.16 MB]
|
|
Pre-Qualification Statement For Construction Of Twin HDPE Forcemains & Single Water Main Pipeline
|
[704 KB]
|
|
Geotechnical Investigation, Proposed Utility Service Approaches, Great Cataraqui River Utilities Crossing, Inspec-Sol,
Final Report of February 5, 2003.
|
[3.89 MB]
|
|
Geotechnical Investigation, Proposed Duty Drive Up-Grades, CFB Kingston, Inspec-Sol, Final Report of March 6, 2003.
|
[221 KB]
|
|
Preliminary Baseline Environmental Assessment, Department of National Defence (DND) Property, Inspec-Sol Final Report of
September 26, 2002.
|
[179 KB]
|
|
Supplemental Environmental Assessment Volume 1 - Proposed Utility Service Approaches
|
[1.63 MB]
|
|
Supplemental Environmental Assessment Volume 2 - In Waterworks-Docking Area Near West Shore
|
[1.63 MB]
|
|
Supplemental Environmental Assessment Volume 3 - Supernatant Fluid & Sediment Testing
|
[1.01 MB]
|
|
Stage 2 Archaeological Assessment, Cataraqui River Trunk, Sewer Line Crossing, East Bank of Cataraqui River, Military
Reserve, Geographic Township of Pittsburgh, Heritage Quest, report dated October 7, 2002
|
[4.87 MB]
|
|
Cataraqui River Utilities Crossing, Mount McGovern, report dated September 6, 2002
|
[1.40 MB]
|
|
Supplemental Geotechnical Assessment (Vol. 4), July 2003
|
[1.84 MB]
|
|
Geotechnical Assessment Proposed Dewatering Facility, Knox Farm
|
[1.95 MB]
|
|
EA Addendum: Appendices (Note: This file is more than 10MB)
|
[10.19 MB]
|
|
Geotechnical Assessment: Proposed River Street Pumping Station Upgrades (August, 2003)
|
[523 KB]
|
|
River Street Pumping Station: Pre-Construction Limited Designated Substance Review (November, 2003)
|
[620 KB]
|
|

|

[VISIT THE
CITY SITE]

|

|
|