Utilities Kingston has initiated a Master Plan Study to identify improvements and works required to meet the water
supply needs of the City of Kingston urban area. The Master Plan study area and planning horizon are based primarily on
the preferred growth scenario and projections identified in the City of Kingston's Urban Growth Strategy - Final Report
(July 2004).
The Master Plan approach is intended to provide an inter-related study of the Kingston West, Kingston Central, and
Kingston East water treatment and supply systems/facilities and an assessment of the City's water supply requirements.
Utilities Kingston wishes to optimize existing system resources, and identify works and modifications that will
implement a cohesive water treatment and distribution plan.
Utilities Kingston has retained Simcoe Engineering Group Limited to complete the Master Plan study for Water Supply for
the City of Kingston. This Master Plan study will proceed to the end of Phase 1 and Phase 2 all in accordance with the
Master Planning requirements under the Municipal Class Environmental Assessment, June 2000 (selection of the preferred
alternative to allow confirmation of the required schedule to proceed to alternative design concepts for the preferred
alternative).
A Notice of Study Commencement was first issued in the local newspapers on July 11, 2006. A previous Public Information
Centre (No. 1) was held on Wednesday, November 29, 2006.
The public consultation process is an essential part of this study. Accordingly, Utilities Kingston will be holding a
second Public Information Centre (an informal presentation) on Monday, March 19, 2007, from 4 p.m. to 7 p.m. at the
Portsmouth Olympic Harbour, 53 Yonge Street, Kingston, Ont. in the Press Room. We invite all Kingston residents to
attend and provide input regarding the current status of the Study, the various water supply and distribution
alternatives selected, and the preferred alternative. For more details on the 'Master Plan for Water Supply for the City
of Kingston Urban Area' and how you can be involved, visit www.utilitieskingston.com. If you have questions regarding
this study or if you would like to be included on the study mailing list, please contact watermasterplan@utilitieskingston.com
or:
|
Larry Manley, P.Eng.
Kingston Manager
Simcoe Engineering Group
1020 Bayridge Drive
Suite 200
Kingston ON K7P 2S2
Tel: 613-389-1661
Fax: 613-389-2442
|
Chantal Chiddle, P.Eng.
Utilities Engineer
Utilities Kingston
1211 John Counter Blvd
Kingston ON K7L 4X7
Tel: 613-546-1181 ext. 2356
Fax 613-542-1463
|
|