Project Background

|
 |
|
RELATED LINK
PROJECT HOME
Visit the Crerar Boulevard Sewage Lift Station home page.
|
|
|
 |
Utilities Kingston has completed a Class Environmental Assessment to identify the
preferred method of providing additional sewage pumping capacity and stand-by generation
capacity, and to correct existing deficiencies in the heating and ventilation systems,
electrical systems and controls.
This project was undertaken in accordance with the procedures set out in the Municipal
Class Environmental Assessment, June 2000, as amended in 2007. The Municipal Class EA
applies to municipal infrastructure projects including roads, water and wastewater
projects. Alternative solutions were identified and evaluated in consultation with the
public and other stakeholders.
Due to noise issues with installing a larger generator within the existing structure, the
project was revised and alternative planning solutions to address this issue were
developed and evaluated using technical, environmental and economic criteria.
Public Review Period
A draft Environmental Study Report (ESR) has been prepared to document this project. A 30-day
public review period is to commence for this report on Oct. 28, 2008. During this period,
copies of the report will be available for public review at Utilities Kingston. Further
information may be obtained from the City consultants, TSH Associates, 300 Water St,
Whitby ON, L1N 9J2. Telephone (905) 668-9363. Attention Michael Gundry, Project Manager.
Please provide written comment to Mr.Mike Fischer, Utilities Engineer at Utilities
Kingston, within 30 calendar days from the date of this Notice. If concerns regarding this
project cannot be resolved in discussion with Utilities Kingston, a person may request
that the Minister of the Environment make an order to comply with Part II of the
Environmental Assessment Act (referred to as a Part II Order), which addresses individual
environmental assessments. Requests must be received by the Minister at the address below
by November 27, 2008. A copy of the request must also be sent to the Utilities Kingston.
If no requests are received by November 27, 2008, the project will proceed to the design
stage as outlined in the Project File.
Minister of the Environment
135 St. Clair Ave. West, 10th Floor, Toronto, ON, M4V 1P5
This Notice issued October 28, 2008.
|